Grid Code for Medium Scale Distributed Generation (MSDG) (200 kW up to 2 MW installations)

Source: JOIN IEA/IRENA Policy and Measures Database
Last updated: 10 January 2018

This Grid Code describes the technical criteria and requirements for the connection of distributed generation plants of capacity greater than 200 kW but not exceeding 2 MW to the CEB’s 22 kV distribution network.

This Grid Code caters for the connection to the CEB distribution network and production of electricity by the following list of Renewable Energy Technologies (RETs): 

  1. Photovoltaic (PV)
  2. Wind Turbine Generator (WTG)
  3. Hydroelectric Generator
  4. Biomass-based generator

 