Resolution on transmission charges for renewable energy generators ("Stamp System")

Source: JOIN IEA/IRENA Policy and Measures Database
Last updated: 30 November 2015

Resolution that issues a new model cotract for the interconnection of renewable energy plants.  The model contract utilizes the "stamp system" (estampilla postal) which establishes a system of transmission fees per kWh.

 

 

Want to know more about this policy ? Learn more