The Act on production of electricity based on renewable energy sources establishes system of certificates guaranteeing renewable origin of the electricity produced. Certificates are necessary for the administration purposes and dealings between plant’s owner and network operator and other administrative purposes.

 

The Act outlines method of calculating feed-in tariff (FIT) levels for renewable energy electricity. 

FIT levels vary depending on the renewable energy source and generation capacity of the plant.

FITs are being guaranteed for a period of 15 years for all types of renewable plants counting from the year when the plant was connected to the national grid.

Renewable source

Power plant capacity

Period of time

Feed-in tariff in EUR/MWh

Yearly reduction

Additional bonus in EUR/MWh

Wind

All sizes

15 years

82.70

0.25%

N/A

Solar PV rooftops

< 30 kW

420

3%

30 kW – 1MW

370

Hydro

< 1 MW

105

0.25%

1 – 6 MW

85

Biogas

< 150 kW

150

EUR 30/MWh under certain conditions

150 – 300 kW

140

300 – 500 kW

130

500 kW – 2.5 MW

120

Wastewater

All sizes

65

N/A

Solid biomass

< 1 MW

145

EUR 30/MWh under certain conditions

> 1 MW

125

Wood waste

< 1MW

130

1 – 5 MW

110

The Act introduces additional bonus for commercialised heat generated by combined heat and power based on biomass, biogas and wood waste. Bonus is paid on top of the feed-in tariff. The level of the bonus is EUR 30/MWh. In order to benefit from the additional premium certain conditions must be met. 