This Ten-Year Plan presents measures over the period to 2031 to reinforce infrastructure of the national power transmission system, address existing problems, and respond to future challenges and implement new opportunities. The Ten-Year Plan aims at presentation and analysis of the future environment and reducing uncertainties to obtain plausible projections and establish unified and well-structured vision about transmission grid development. The Ten Year Network Development Plan of Georgia is elaborated and updated annually according to the “Law Of Georgia On Energy And Water Supply”. 18 projects of systemwide importance have been identified to strengthen internal power transmission system and interconnection lines with neighbouring countries. Total investment needs: 700 million EUR